美女扒开屁股让男人捅欧美日韩视频高清在线|91露脸人妻少妇|女人18毛片a|日本人妻在线一区|国产女人水真多18毛片精品|撕开奶罩揉吮奶头高潮视频|丰满少妇人妻hd|日韩 免费 av|人妻激情久久久久|舔我奶子视频,91午夜看片,极品少妇高潮喷水日本wwwbbb熟妇色 ,日本女优av天堂

NEWS

Repair and maintenance of vertical laminating machine

Date:2016-11-12    Font size:Big  Medium  Small

Vertical laminating machine repair and maintenance of the laminating machine is the main part of the heating aluminum plate, the original station, hydraulic cylinder, distribution box, etc.

1 After the heating plate is broken, the temperature does not rise (or the temperature rises very slowly) (normal temperature rises for half an hour) that is the heating tube is broken, remove the screw of the square tube and replace the heating tube on it (heating tube 220 electricity)

2. The original station is to control the lifting of the cylinder, so it is very important to fill the vertical laminating machine with a little oil (Great Wall Zhuo Li hydraulic oil), and the working time can not exceed 10 hours after the overtime will damage the machine, change the hydraulic oil once a year.

3. The hydraulic cylinder should not be too hot as it will slowly leak oil, so the working time should not exceed 10 hours.

The distribution box is composed of rotary switch indicator light, temperature control, voltmeter, time relay and button. If any part is not working, replace it immediately.

5 high temperature paper with material baked, stick to the high temperature paper with water cloth can be wiped.

Bake material is more than the replacement of high temperature paper must be used before the replacement of vertical laminating machine yarn paper to wipe the black residue to towel paste.



HOME

PRODUCTS

INQUIRY

CONTACT US